top of page

Location: Hycroft Mine, Winnemucca, NV
 
Client: Allied Nevada Gold Corporation
 

Job Description: The project included civil, structural, mechanical, and electrical for the installation of the crushing plant at the Hycroft Mine. The work entailed 100,000 cyd's of structural backfill, 21,000 cyd's of concrete foundations, installation of a gyratory crusher, two secondary cone crushers, two tertiary cone crushers, apron feeders, screens, 5,500 lf of conveyors and all associated piping, electrical and instrumentation. 
Location: CC&V Mine, Cripple Creek, Co.
 
Client: AngloGold Ashanti (Colorado) Corporation
 
Job Description: The Arequa Pipeline Project included installation of 4,279 lf of 24" preg solution pipeline, 4,574 lf of 30" barren solution pipeline and 3,150 lf of 30" enrichment solution pipeline. The pipeline was above ground, welded carbon steel and included installation of the valves, fittings, pipe supports and cathodic protection.

Location: Mineral Park Mine,  Kingman, Arizona
 
Client: Mercator Minerals
 

Job Description: Grassroots construction of a 50,000 TPD copper/moly concentrator. Project consisted of jaw crusher, stacking and reclaim system, two sag mills, two ball mills, rougher flotation cells, cleaner flotation cells, thickeners, MCC building, sub-station, concentrator building, concentrate handling system for both copper and moly concentrate, and tailings system. All disciplines were self-performed including concrete, structural steel, mechanical, piping, and electical and instumentation. 

Location: Leeville Mine, Carlin, NV.
 
Client: Newmont Mining
 

Job Description: Project consisted of placing 1,100 cyds of concrete, structural steel erection, three 10 ton bridge cranes, installation of lube oil tanks, piping and four roll-up fire doors for the underground mine maintenance shop.
bottom of page